Pearland Natatorium Renovation
Landmark Aquatic successfully completed a comprehensive renovation of the Pearland Natatorium, enhancing its filtration, circulation, and overall pool system efficiency. The project involved major mechanical upgrades, structural refinements, and aesthetic improvements to ensure long-term performance and sustainability for both the competition and activity pools.
Filtration System Upgrades:
Removed three highly corrosive Vac-Sand filtration systems.
Installed two Neptune Benson Defender filters and two 25HP pumps for the competition pool.
Installed one Neptune Benson Defender filter and one 10HP pump for the activity pool.
Installed all new above-ground circulation plumbing for all three filtration systems.
Mechanical Room Enhancements:
Excavated the existing indoor mechanical room.
Poured new surge pits and pump pits for both pools.
Chemical & Water Treatment Improvements:
Installed Acid Rite and AccuTab automated chemical feeders for both pools.
Replaced existing ProMinent chemical controllers.
Reutilized existing Hanovia UV control cabinets while installing new UV chambers and components.
Installed H2Flow VFDs and Bypass units for all three filtration systems.
Installed new autofill and high-water level systems.
Pool & Deck Refinements:
Replastered the competition pool with blue/black quartz plaster.
Refinished two 1-meter dive stands and one 3-meter dive stand.
Reinforced and refinished existing bulkheads.
Replaced all pool lighting fixtures and bulbs.
Refinished, stained, and sealed the existing stamped concrete pool deck.
Project Impact
This renovation significantly improved the Pearland Natatorium’s operational efficiency, water quality, and aesthetic appeal, ensuring an enhanced experience for athletes, coaches, and visitors. The upgraded filtration and circulation systems will provide long-term sustainability while reducing maintenance demands and operational costs.
Project Information:
- Location:
- Pearland, TX
- Owner:
- City of Pearland
- Completion Date:
- 2025