The City of Mont Belvieu’s Eagle Pointe Recreation Complex wave pool underwent a renovation completed at the end of 2022. There was a complete strip of plaster down to the concrete shell and over 14,000 square feet of new plaster was poured. Carbon fiber concrete staples were used to achieve stabilization of a pre-existing pool floor crack, and pebble-tech coating was applied after the zero-depth entry coating was removed. In addition, over 2,000 square feet of eye-catching, blue-toned, 2-inch-by-2-inch tile and main drain covers were replaced.