Mont belvieu wave pool

The City of Mont Belvieu’s Eagle Pointe Recreation Complex wave pool underwent a renovation completed at the end of 2022. There was a complete strip of plaster down to the concrete shell and over 14,000 square feet of new plaster was poured. Carbon fiber concrete staples were used to achieve stabilization of a pre-existing pool floor crack, and pebble-tech coating was applied after the zero-depth entry coating was removed. In addition, over 2,000 square feet of eye-catching, blue-toned, 2-inch-by-2-inch tile and main drain covers were replaced.

Key highlights:

The City of Mont Belvieu’s Eagle Pointe Recreation Complex wave pool underwent a renovation completed at the end of 2022. There was a complete strip of plaster down to the concrete shell and over 14,000 square feet of new plaster was poured. Carbon fiber concrete staples were used to achieve stabilization of a pre-existing pool floor crack, and pebble-tech coating was applied after the zero-depth entry coating was removed. In addition, over 2,000 square feet of eye-catching, blue-toned, 2-inch-by-2-inch tile and main drain covers were replaced.

Location:

Mont Belvieu, TX

Owner:

Eagle Pointe Recreation Complex, City of Mont Belvieu

Designer:

General Contractor:

Year completed:

2022

Questions?

Our experienced team is here to help you find the right solution for your aquatic project. Contact us today for product recommendations and a personalized quote.

What our customers are saying