MEMORIAL NORTHWEST
Progressive was contracted by Memorial Northwest as a Design Builder to perform a complete overhaul of the HOA’s aquatic facility. The $4.3 million investment funded a complete replacement of the 50-year-old pool. The project consists of a new 4,750-square-foot competition pool with eight 25-yard lap lanes. It also includes a 7,000-squre-foot leisure pool with zero-depth entry, three stair entries, underwater benches, a water walk, play structure, various spray features, and a waterslide.
Project Information:
- Location:
- Spring, TX
- Owner:
- Memorial Northwest HOA
- Designer:
- Counsilman-Hunsaker
- GC:
- Progressive Commercial Aquatics
- Completion Date:
- 2019