FORT BEND ISD AQUATIC FACILITY
This “training pool” has a lot to offer – From the pre-engineered steel structure, clad with semi-translucent roof panels, to the concrete shell and ceramic tiles gutters. With two fiberglass 6-foot bulkheads, Colorado Time Systems scoreboard and timing, the 75-foot by 213-foot, 930,000-gallon pool will accommodate any competitive and instructional configuration.
Project Information:
- Location:
- Houston, TX
- Owner:
- Fort Bend ISD
- Designer:
- Kirksey Architecture
- General Contractor:
- Gamma Construction
- Completion Date:
- 2011