Fleet swimming pump room

The renovation for Fleet Swimming’s pump room included digging out and concreting a new pump pit. There was also an addition of variable frequency drives, flow meters, and two flooded suction pumps, which makes priming much easier for operator. In addition, repetitive TR-140 filters were removed and replaced with two high-rate sand filters, current water heaters were relocated, and the system was re-attached to chillers. This project increased safety, eliminated the need to step over piping, and made all equipment more serviceable.

Key highlights:

The renovation for Fleet Swimming’s pump room included digging out and concreting a new pump pit. There was also an addition of variable frequency drives, flow meters, and two flooded suction pumps, which makes priming much easier for operator. In addition, repetitive TR-140 filters were removed and replaced with two high-rate sand filters, current water heaters were relocated, and the system was re-attached to chillers. This project increased safety, eliminated the need to step over piping, and made all equipment more serviceable.

Location:

Cypress, TX

Owner:

Cypress Fairbanks Swim Club

Designer:

General Contractor:

Year completed:

2022

Questions?

Our experienced team is here to help you find the right solution for your aquatic project. Contact us today for product recommendations and a personalized quote.

What our customers are saying