Fairgrounds Aquatic Center

This design-build new construction included a zero-depth entry, aquatic play unit, single flume slide, Life Floor slip-resistant flooring, 1-meter diving board, climbing wall, water basketball and Aqua Zip’N. In addition to the pool, a spray pad was constructed. Infrastructure construction included a new bath house, pool deck, and shade structures.

Key highlights:

This design-build new construction included a zero-depth entry, aquatic play unit, single flume slide, Life Floor slip-resistant flooring, 1-meter diving board, climbing wall, water basketball and Aqua Zip’N. In addition to the pool, a spray pad was constructed. Infrastructure construction included a new bath house, pool deck, and shade structures.

Location:

Mexico, MO

Owner:

City of Mexico, MO

Designer:

Landmark Aquatic

General Contractor:

Landmark Aquatic

Year completed:

2021

Questions?

Our experienced team is here to help you find the right solution for your aquatic project. Contact us today for product recommendations and a personalized quote.

What our customers are saying