At College Station Middle School, an extensive renovation project was completed of the 8-lane competition pool and pump room. This project included incorporating anchors to facilitate an ADA lift and water polo goals, in addition to the installation of new stainless-steel handrails, ladders, and starting blocks. The facility’s pump room saw the installation of a new UV system, pump motor, an automated fill system, a chemical monitoring system, and an Acid-Rite chemical feeder. The renovation also included the replacement of the waterline, gutter, and parapet tile, with a restoration of the water polo course tile. The outdated sand filter system was replaced by a singular Neptune Benson high-rate sand filter. Creating a balance between innovation and sustainability, the Accu-tab chlorinator system and the preexisting pool heating system were reused, a new pool vacuum was procured, and the safety equipment was refurbished. Most notably, the entirety of the above-ground pool circulation piping underwent replumbing and the pool shell was replastered.










Our experienced team is here to help you find the right solution for your aquatic project. Contact us today for product recommendations and a personalized quote.
We are so appreciative of the incredible work Landmark Aquatic has done and are continuing to do for Texas Parks and Wildlife. The professionalism, quality of work and can-do attitude of the Landmark team is truly amazing!
Wished to take a moment to say we appreciate the extremely fast response and repair to our systems. It took less then 3 hours from initial call to completion, which is impressive.





