Fort bend isd aquatic facility

This “training pool” has a lot to offer – From the pre-engineered steel structure, clad with semi-translucent roof panels, to the concrete shell and ceramic tiles gutters. With two fiberglass 6-foot bulkheads, Colorado Time Systems scoreboard and timing, the 75-foot by 213-foot, 930,000-gallon pool will accommodate any competitive and instructional configuration.

Key highlights:

This “training pool” has a lot to offer – From the pre-engineered steel structure, clad with semi-translucent roof panels, to the concrete shell and ceramic tiles gutters. With two fiberglass 6-foot bulkheads, Colorado Time Systems scoreboard and timing, the 75-foot by 213-foot, 930,000-gallon pool will accommodate any competitive and instructional configuration.

Location:

Houston, TX

Owner:

Fort Bend ISD

Designer:

Kirksey Architecture

General Contractor:

Gamma Construction

Year completed:

2011

Questions?

Our experienced team is here to help you find the right solution for your aquatic project. Contact us today for product recommendations and a personalized quote.

What our customers are saying